In 1995 and 1996, I built a Bastidon in Provence (South of France).
The project had 21 tasks (2 tasks canceled), it was planned for a
duration of 33 man-day, realized in 47 man-day, used 5 m³ of concrete,
2000 kg of ciment, 300 rubble stone, 8 m³ of sand and gravel and about
100 kg of iron. All the details are defined in the document
Bastidon Lou Mistraou.
Here are some pictures of the building.

Les fondations (T2) |

Un peu de dammage (T3) |

Du beton, un peu (T4) |

En bas des murs (T6) |
|